Tuesday, March 2, 2010

Update

Today, I’ve bought three Austrian locos from an uncle (two Lilliput 0-6-2 http://www.buccabury.co.uk/ltr/museum-no09.jpg and a 0-6-0 of an unknown maker) and four coaches one without wheels. I'm not yet sure on which livery to paint my locos and stock, either the ffestiniogs brown
http://en.wikipedia.org/wiki/File:FR_Carriage8.jpg
maroon
http://en.wikipedia.org/wiki/File:Ffestrail_coaches_at_Tanybwlch.jpg
green http://en.wikipedia.org/wiki/File:FR_Carriage20.jpg
or mat black with lining... hmmm.
I didn’t like the colors they came in so I sprayed the two Lilliput locomotives a matt black color. I've also striped one of the coaches, (remove body, then all the windows) and sprayed it matt black too, this will give me a rough idea how the layout would look if some of the stock and locomotives where black.
Also he gave me a scratchbuilt (out of cardboard) Penrhyn mainline class 0-4-0 (Linda, Blanche or Charles as they where originally, no pony truck and no tender). This is in a bit of a ‘mangled’ state, I’ve got two ideas, one is to try to replace the broken bits, and eventually put it in the scrap line / being restored in a workshop OR make it look nice and shiny, then place it on a plinth. Either way, it probably will never run.

Sunday, February 21, 2010

Control Panel construction

A few days ago I ordered 50 on-off-on switches for £14. Thursday in the mail there was a few guitar parts! So we emailed the seller and he said that he can’t deal with anything until the 21st. But Friday, the switches arrived :) I think he just out the wrong address on the guitar bits. Anyway over the weekend I was in Kinmel Camp with the Army Cadet Force doing some training and shooting the L85 Light Support Weapon (Automatic 600 rounds every 60 seconds!) so no progress was done. But I’ve just arrived home and planning to work on the control panel later on today. Tomorrow, I’m off to Boston Lodge (the real one) to try to fit some axle boxes to the bottom end of Earl of Merioneth.

Monday, February 15, 2010

Half Term Progress

Over the next week almost nothing will probably get done. I've decided to go to work on the real Ffestiniog Railway at Boston Lodge. The only time something might get done is Saturday and Sunday, but if I could help dad to get the wiring of the garage done over the weekend I could then work a bit later in the night on the layout! Decisions, decisions!!

Friday, February 12, 2010

Update

There’s been almost no progress since the last update; the only difference is that I’ve had to disassemble it to allow access to re wire the garage. I'm planning to help dad re wire the garage so I could spend more time on the layout. I have made a list of things that I need to do to get it operational.
1) Drill the holes between the boards to 7mm to allow the bolts to go in and out easily.

2) Make the control board, wire the control board and make the connections (out of D plugs) including all of the connections between the boards.

3) Wire up the track and points.