This post surprisingly, is about bogies!
For the 8 new carriages i have for the layout, built by Colin Lea (www.rhydddu.blogspot.com) originally were going to be put on modified Lima n gauge bogies. That idea, soon went through the window, they where only chosen in the first place as I was given quite a few of them.
Instead, I decided try out the Parkside Dundas 'Standard Ffestiniog 3' 6" w/b bogie' kit. One was bought from the FRs shop and assembled. It took a while to figure out how many 10 BA washers the bogie needed underneath for the bogie to have adequate swing, and not look silly, but eventually I settled for two per bogie.
Some 009 couplings were superglued on to the bogie frames, which resulted in a coupling which is the perfect height. The pictures are of carriage 112 with the bogies, parked against Cricieth Castle and the modified Lima bogie.
More of the bogies and couplings will be bought tomorrow, so all of the carriages that I have will be rolling by the end of the weekend.
Thursday, September 20, 2012
Tuesday, September 18, 2012
More wires than the Thunderbirds!! (Part 1)
Tonight, the wiring for the workshop board was completed. This is the most complicated board.
It has 5 point motors, two track circuits, 5 buildings that have lights, several small accessories (Welders' lights etc) the controls for the layout's lighs and 'accessories' circuit and finally the input from the 16v AC (points + track), 12v DC (bright lights) and 9v DC (Accessories and dimmer lights).
Tomorrow evening, I will start on the station board, which only has 3 points, 2 signals, lights and accessories circuits. Much simpler!!
It has 5 point motors, two track circuits, 5 buildings that have lights, several small accessories (Welders' lights etc) the controls for the layout's lighs and 'accessories' circuit and finally the input from the 16v AC (points + track), 12v DC (bright lights) and 9v DC (Accessories and dimmer lights).
Tomorrow evening, I will start on the station board, which only has 3 points, 2 signals, lights and accessories circuits. Much simpler!!
Sunday, September 16, 2012
Raising the sea...
Litrally!
I spent a few hours today, getting on with a few odd jobs, Warely is coming closer!!
The sea level was raised from 'empty' to a (scale) 10ft deep. This was done with a simple wooden frame and plywood. It will be painted, then varnished several times to get a sea effect.
You might notice a station and coaches has appeared in the attached photo. It's a old FR station, which still exists but not Porthmadog, any guesses?
As for the coaches, they are the ones that Colin Lea kindly agreed to build for me ready for Warely more details to follow.
Throughout the next week, the electrics in the boards will be sorted out.
I spent a few hours today, getting on with a few odd jobs, Warely is coming closer!!
The sea level was raised from 'empty' to a (scale) 10ft deep. This was done with a simple wooden frame and plywood. It will be painted, then varnished several times to get a sea effect.
You might notice a station and coaches has appeared in the attached photo. It's a old FR station, which still exists but not Porthmadog, any guesses?
As for the coaches, they are the ones that Colin Lea kindly agreed to build for me ready for Warely more details to follow.
Throughout the next week, the electrics in the boards will be sorted out.
Monday, September 3, 2012
Weekend Progress
Over the weekend, some good progress was made. The backscene was shortened in height and permenantly fixed, Controll panels and controllrs were mounted, they will be wired in within the next week.
A length of plastic cable conduit was bought to try out a fiddle yard cassette system, a post will soon follow on the results of a few test pieces I've just finished making.
Here's some pictures.
A length of plastic cable conduit was bought to try out a fiddle yard cassette system, a post will soon follow on the results of a few test pieces I've just finished making.
Here's some pictures.
Subscribe to:
Posts (Atom)




