Saturday, March 30, 2013

Getting there

I'm currently in the attic, working on the Porthmadog board's wiring. At Warely, one of the problems I had was the track changeing shape due to the heat. Then because everything wasn't were it should be, I had problems with the point blades picking up the current.
So when re-wiring everything to go into a 25 pin D connector, I've added more track power feeds and used the built in switch in the Seep point motors to switch the power from one track to another.

No comments:

Post a Comment