Sunday, June 30, 2013

Extensions

The weekend was spent with Marrin Neeves building two new baseboards. A Cob board was built to go between the Workshops and Porthmadog Board that is 6ft long.
The second board that was built was a fiddle yard. It is 50% longer than the previous so it could hold more than two full length trains.
There will also be enough space for a digital photo frame for photos of the layout being built etc.
Now some tracks and wiring need to go in.

No comments:

Post a Comment