Wednesday, April 3, 2013

Prototype

The parts for the prototype Fairlie bogie I've designed has started to arrive. Within a week all of the parts should be here and I can start assembling.
Fingers crossed!!

Monday, April 1, 2013

Workshops

i haven't been happy with the workshops that are on the layout. So after frying my brain trying to find a short in the track circuit (post discribing it to follow tomorrow), I went to draw up a new workshop building.
I've decided to alter the track layout a bit as shown in one of the photos below. The other photo is the scale drawing of the 'spectator side' of the new workshop building, with Prince posed next to it for an idea of size.
I've ordered some foam board ready to start building it soon. It is loosely based on the side of the blacksmiths shop at Boston Lodge.
It will be fully detailed inside with the two smaller windows on the right being a drawing office and mess room.

Saturday, March 30, 2013

90% Complete!

The wiring is now almost complete, the last 10% is the short somewhere in the track power circuit! That will be sorted Monday, I've got a stoking turn on the 'David Lloyd Merioneth' tomorrow!

Getting there

I'm currently in the attic, working on the Porthmadog board's wiring. At Warely, one of the problems I had was the track changeing shape due to the heat. Then because everything wasn't were it should be, I had problems with the point blades picking up the current.
So when re-wiring everything to go into a 25 pin D connector, I've added more track power feeds and used the built in switch in the Seep point motors to switch the power from one track to another.