Sunday, November 7, 2010

Progress over the weekend

Firstly, I apologise for the lack of updates over the last month, been a bit busy with collage and work.
But, over the weekend massive progress have been made! The legs have been screwed into the baseboard and a frame the same dimensions as the baseboard has been screwed into the bottom of the legs. 50mm castors have then been screwed into the bottom of each leg to make it portable. The baseboard for the station module was re laid. The way I did it last time wasn't the best way in the world. So hers a picture of the progress so far....



Unfortunately I am starting to regret converting the B.L board (and had plans to convert the rest of the layout) to DCC. It dawned on me, that its going to be a fair bit more expensive to go DCC... So watch this space...
Also some Peco 009 points and Gaugemaster PM-1 point motors have been ordered. a neat little feature on the PM-1 is a built in accessory switch, which will be used for powering the LEDs in the control panel to indicate which way the point is set. There is still quite a bit to do to get the layout running, including building a 6 or 7 road fiddle yard. Hopefully some N gauge points will be bought at the Warely Exhibition at the NEC in three weeks.

Tuesday, October 5, 2010

"Let there be light"

Well, two light bulbs at least. After a half day in collage yesterday, i decided to go and have a browse around Home Bargains. And I managed to buy a few odd things for the layout.
1) A children’s Halloween mask, with flashing eyes. With a bit of butchering of the mask and clever rewiring, I think it could make a good impression of a fire or an arc welder.
2) Two 'clip on' lamps without lampshades. I bought these to experiment with the lights on my layout. I'm thinking of (somehow) making a 'structure' that will support the lights from above. A board will be placed along the front of them with the name of the railway, exhibition badges and info about certain locomotives and features on the layout, such as a (very) brief history of the layout of maybe a timeline of the FR, not sure yet.
Also I have been thinking a bit more about how I can support the layout. My problem is that it needs to be fairly movable because dad wants enough space in the garage for 'emergency use' i.e. he needs to do something on the car without warning. So I have come up with some sort of a system (I think).
I might build a steel box tubing frame underneath that somehow 'screws' onto the layouts wooden frame, it will also have a way of supporting the lights. The best thing about it is that the lights will be able to slide down and protect the layout in transit. The structure will also be on four casters with brakes, so when the garage needs to be used, it can simply roll into the corner. Bit more thought is needed with this idea.

Friday, September 17, 2010

Carriage 100 painted and (Almost) finished

I painted the carriage today, in the FR Green Livery. These are the pictures.. on the layout!
I'm writing an article for a magazine and decided to put the layout up and photograph the progress up to now. The sand is only dropped on for a bit of 'visual effect' I will probably brush it off later on or tomorow.
Also just out of curiosity, i put all of my FR passenger stock together, headed by Pamlerston (which will serve the steam hammer at the works when the building is constructed).
After seeing the layout like this it has given me a boost to get on with the
electrics so i can start on the scenics!









Thursday, September 16, 2010

New Carriage and Facebook Page

Today, the new carriage from Robert Waller arrived. So the paint was out! (After I photographed it)






Firstly the sides and end (bottom end) where masked off, leaving the 'corridor' to be painted Matt Black with the roof. The chassis and carriage where then painted with an airbrush.



Whilst the Matt Black was drying I decided to test a paint colour I was given by my uncle. It's Railmatch 'Frame Dirt'. When observing the obs, and various other carriages in the carriage shed. I noticed that the bodywork of the carriages are kept very clean (cleaned weekly) But, the chassis and bogies aren’t, they are covered with the dust from the lubrication pads Boston Lodge produces (so I’m told)
They are surprisingly dirty, so I’m going to replicate this but not as 'strong'. I am also thinking of painting some carriages as 'new' and others more weathered, to vary the appearance a bit.
Just to let you all know, I've made a Facebook page, where 'quick little' updates will be posted, but the majority of posts will be here. Also the page 'Gallery' will only hold links to the Albums on Facebook.