The first public appearance of Traeth Mawr is now less than a week away, I’ve removed the backboard to re-install a point motor that didn't work, so whilst the backs are off they are being painted. I've ran a train from one side to the other, and the a All Components 12 AC transformer has arrived in the post for the controller and points with a package from GEM model kits with 2 ffestiniog open wagons, 2 ffestiniog slate wagon (4 wagons) 3 Lynton and Barnstable open wagons and 2 ffestiniog Vans, now all I need to do is assemble them! On the picture is a row of scatter and a few odds and ands for scenic work!!
No comments:
Post a Comment