Wednesday, December 5, 2012

Alterations

I've finally got round to re-erecting the layout. The three 'major' changes will be done first, over the next few weeks (months?)
First off, is altering the harbours track plan to allow trains to be ran into the slate wharf. This is to allow more variety of trains to be run, 'scenic' storage areas for the stock to be displayed and finally somewhere for the gravity train to run to!
Second is a centrally mounted Controll panel, which will let the layout be operated from the front and back by one operator.
Finally, more insulating sections and track feeds to allow more things to happen at the same time.
This is a revised track plan of the harbour crossover. The red lines are track, blue spur is a catch point. I apologise for the poor quality, it was made by hand on my phone and I seem to be suffering from the shakes!!

No comments:

Post a Comment