Today I recieved three signals. Two Dapol n gauge LMS home signals, one new and the other is not working. The other signal is a 2 aspect colour light signal.
The colour light signal will be placed 'in front' of the broken semaphore, which after magically turning it into a 4mm/1ft signal, i removed the arm and made it look like it was being decomissioned. The working Dapol signal has had the same work, turning it to 4mm/1ft but left intact. This will become the home signal.
Here's some pictures of the signals, personally I think it looks alright, especially with the Earl parked next to it (on my work top test track)
Tuesday, October 2, 2012
Sunday, September 30, 2012
Today's progress
Today, the layout is now 90% wired up and operable. It only requires the lights etc to be connected then the fiddle yard to be sorted.
A good portion of time was spent building Parkside Dundas FR bogies to fit under the carriages. (see picture attached) An additional 6 where made, only another 14 to go!! I've also built a Parkside Dundas 4 wheel Hudson Steel bodied wagon,kit a Carriage 10 / Van 2 kit and FR style 3rd compartment bogie waggon.
As for the Earl, I'm getting more and more frustrated with the chassis. The poor quality of the whitemetal castings mean that it teeters on two wheel sets, which means it will wobble whilst moving and slip with minimal load, I need to find a solution, quick!
By the way things are going, I'll only have a ALCo, Prince, Cricieth Castle and Taliesin working at Warely with Oliver Bennett's Welsh Pony. The Earl will most likely parked outside works! A shame really...
A good portion of time was spent building Parkside Dundas FR bogies to fit under the carriages. (see picture attached) An additional 6 where made, only another 14 to go!! I've also built a Parkside Dundas 4 wheel Hudson Steel bodied wagon,kit a Carriage 10 / Van 2 kit and FR style 3rd compartment bogie waggon.
As for the Earl, I'm getting more and more frustrated with the chassis. The poor quality of the whitemetal castings mean that it teeters on two wheel sets, which means it will wobble whilst moving and slip with minimal load, I need to find a solution, quick!
By the way things are going, I'll only have a ALCo, Prince, Cricieth Castle and Taliesin working at Warely with Oliver Bennett's Welsh Pony. The Earl will most likely parked outside works! A shame really...
Saturday, September 29, 2012
Shiny...
Here she is, the Earl of Merioneth with shiny brass domes. She still requires modifications to the chassis to make it work, which will hopefully be done tomorrow.
Another Fairlie from Boston Lodge
Almost all staff, voulenteers and any enthusiast that visits the Ffestiniog Railway, will know that the FR, is where Robert Francis Fairlie finally developed a working (efficiently) double engine, and waved the patent fee for all Fairlie locomotives built there. But I can bet that Robert Fairlie never anticipated that a 4mm/1ft Fairlie would be built!
Today was spent machining a boiler barrel for my next project, a Merddin Emrys in 1963 condition, just after it's first Major overhaul since voulenteers had started to rebuild the FR.
It was a very basic machine, it had no sandpots or cab, square edged tanks which where painted in red-oxide primer. It was oil fired and the crews where exposed to the elements, the driver had a little more protection, as his side had 'half height' can sheet (as high as the top of the tanks) whilst the poor fireman had a quarter cab sheet, with handrails at tank top level to stop him tripping over the cab and falling out!
For me, the 60s and 70s are the most interesting period of the FRs history, locomotives where made to run, not to look good, the line was quickly being extended towards Blaenau and locomotives such as the Ladies, ALCo, Peckett and a little known of Austrian Tank was purchased for potential mainline use. Most of which are still in use today.
Here are some photos of the bits I made (including some brass domes for the earl.) The boiler barrel for Merddin is still unfinished, it hopefully, will be finished over the next week. Merddin will have similar shaped domes, but made from steel, painted black.
If anybody requires some domes for they're engines (instead of horrid brass painted ones) let me know, I'm sure I could help.
Today was spent machining a boiler barrel for my next project, a Merddin Emrys in 1963 condition, just after it's first Major overhaul since voulenteers had started to rebuild the FR.
It was a very basic machine, it had no sandpots or cab, square edged tanks which where painted in red-oxide primer. It was oil fired and the crews where exposed to the elements, the driver had a little more protection, as his side had 'half height' can sheet (as high as the top of the tanks) whilst the poor fireman had a quarter cab sheet, with handrails at tank top level to stop him tripping over the cab and falling out!
For me, the 60s and 70s are the most interesting period of the FRs history, locomotives where made to run, not to look good, the line was quickly being extended towards Blaenau and locomotives such as the Ladies, ALCo, Peckett and a little known of Austrian Tank was purchased for potential mainline use. Most of which are still in use today.
Here are some photos of the bits I made (including some brass domes for the earl.) The boiler barrel for Merddin is still unfinished, it hopefully, will be finished over the next week. Merddin will have similar shaped domes, but made from steel, painted black.
If anybody requires some domes for they're engines (instead of horrid brass painted ones) let me know, I'm sure I could help.
Subscribe to:
Posts (Atom)







